BECOME A MEMBER
Connecting New Zealand

Upcoming submission: Draft Government Policy Statement on Land Transport

07 Sep 2023


The government has released its draft Government Policy Statement on Land Transport 2024/25-2033/34. The summary document can be found on the Ministry of Transport website, as well as the full document.

Submissions on the draft GPS close 15 September 2023.

CCNZ will be making a submission. At this stage, we anticipate that our submission will include:

  • Acknowledgement of increased funding, and an increased focus on priority projects, maintenance, resilience, safety, emissions reduction, urban development, and integrated freight.

  • A note that maintenance investment is a great way to provide certainty and retain capacity and capability in the industry.

  • A note that consistent investment in rail would mean a growing industry of skilled constructors, well-prepared to service rail projects.

  • Emphasis on how critical it is that there is certainty in the work programme, and promised projects or funding must translate to actual allocated, programmed/scheduled, funded projects. 

  • Acknowledgement of the renewed focus on value for money, innovation, and best practice to achieve good network condition, but:
    -We need to move away from requiring bespoke designs for every project - $m’s wasted.
    -Value for money should not equate to cheapest option – the design and procurement process should
    provide for the best solution.
    -We need a greater emphasis on partnership and collaboration with those who construct and maintain
    the transport network.

  • We see a looming long-term funding issue:
    -Revenue from the National Land Transport Fund is projected to decrease.
    -We need a long-term vision to sustainably fund improvement and maintenance of the country’s
    transport networks in different ways.
    -Excise taxes and road user charges aren't enough to carry the programme, especially not since the
    addition of new transport activity classes
    – we need a workable user-pays system, or to enable investment from external infrastructure funds.

  • It's disappointing that no consideration has been given to private funding, which could bring projects forward and take the pressure off already strained government finances.

If there are other points you think we should include in our submission, please email CCNZ Communications and Advocacy Manager Fraser May at fraser@civilcontractors.co.nz or CCNZ Chief Executive Alan Pollard at alan@civilcontractors.co.nz with your thoughts as soon as possible.

Members are encouraged to make their own submissions at: https://consult.transport.govt.nz/policy/government-policy-statement-on-land-transport-2024/consultation/intro/

 

 

RELATED


Principal Business Partner
Core Associates
Major Associates
AWF
Brandt Equipment
Humes Pipeline Systems
TDX Ltd
A B Equipment Ltd
Waka Kotahi NZ Transport Agency
Geofabrics New Zealand Ltd
beforeUdig
UDC Finance
Brolube New Zealand
Milwaukee Tool New Zealand
Geosynthetic Partners International Ltd
Franklin Smith Group
Turners Group Ltd: Head Office/Auckland
Porter Group Limited
BNZ Partners
Power Farming New Zealand Ltd
Hynds Pipe Systems
n3
Sheet Pile Ltd
Marley NZ Ltd
RobLawMax Recruitment
Terra Infrastructure Pty Ltd
Komatsu New Zealand Ltd
Mimico NZ Ltd
Coninnova Limited
Kobelco New Zealand
Global Survey - Auckland
Vertical Horizonz NZ Ltd
Manage Company
Absolute Immigration NZ
TVH NEW ZEALAND
Greenlight Insurance Brokers
SITECH NZ
Youngman Richardson
TRIG Instruments
SAMI Bitumen Technologies New Zealand Ltd
Teletrac Navman
CSP Div of Fletcher Steel
Enviro NZ Services Ltd
Rettenmaier New Zealand Ltd
The Drug Detection Agency
Parallaxx
Reliance Reinforcing Limited
H.J. Asmuss & Co. Ltd
Liebherr New Zealand
AECOM New Zealand Limited
Winstone Aggregates
Solo
Blick
Steelgal NZ Ltd
Synergy Positioning Systems
Northpine Ltd
John Deere Limited
ENZED
Firth Certified Concrete
Assetinsure
TR Group
Holcim New Zealand Ltd
Capital Consulting International NZ Limited
Southeys Group Auckland
ERoad Ltd
MATES In Construction
Hydraulink Fluid Connecters Ltd
Wirtgen NZ Ltd
Connexis | Te Pukenga
Commercial Hire NZ Ltd
TotalEnergies NZ Ltd
Assignar
Portacom New Zealand Limited
CivilShare
XCMG New Zealand
TLC Insurance Limited
Mico New Zealand Ltd
Advice Financial
First Gas
Infrastructure New Zealand
Terra Cat
Infrastructure Sustainability Council
Nulca NZ
Doug the Digger
Vertu Equipment Limited

Login





Forgot password?
Create an Account